Serving Salt Lake City, Ogden & the Wasatch Front.  Mon–Fri 9–6 · Sat 8–4  Email: hello@homedeckingpros.com
Home Decking
Pros
Free Deck Check Or, email ushello@homedeckingpros.com
★ 10-Year Workmanship Warranty
Do I need a permit for my deck
Home  ›  Permits & Inspections

Permits, drawn
and filed by us.

Drawings, submission, inspections and the follow-up calls — it is in the quote, not an extra.

What it means

The part most people dread

Most decks over 30 inches above grade, or attached to the house, need a permit. Getting one means drawings a plans examiner will accept, a submission, and being on site when the inspector is.

We do all three. It is quoted as part of the job rather than something that appears on your total halfway through.

  • Permit drawings a plans examiner will accept
  • Submission and follow-up with the city
  • We meet the inspector, you do not have to
  • Included in the quote, not added later
  • Substructure built to be inspected, not hidden
  • Timelines vary by city — yours is in the quote
Deck framing in progress

Built to be looked at

The parts nobody photographs are the parts that fail an inspection. The substructure is built to be seen, because it will be.

How a build runs
Itemized deck pricing

The cost is already in your number

No permit line appearing after you have signed. It is quoted with everything else, before anything is ordered.

How we price
Weathered deck before replacement

Start with what you already have

If your existing deck is being replaced or resurfaced, the Deck Check tells us what the city will want to see.

Free Deck Check
Deck permit drawings

We handle all of it — including the follow-up calls.

Permits are shown to you as live status during the build, not as something you chase.

  • Drawings prepared in-house
  • Filed with your city
  • Inspector met on site
  • Quoted, never added later
  • Status shown, not chased
  • Serving the Wasatch Front, Park City and Heber
Our process

How a build runs.

Week 0 · free
1

Free Deck Check

We measure, photograph and inspect what's there — free, and the report is yours either way.

More →
Before you sign
2

Design

Your deck on your own house in 3D, with an itemized quote your signature locks.

More →
Permit → walkthrough
3

Build

Permit pulled, same crew from demo to walkthrough.

More →
Ten years, in writing
4

Enjoy

No staining or sealing, ever — backed by our 10-year workmanship warranty.

More →
Questions

Before you commit.

Do I need a permit for my deck?
Most decks over 30 inches above grade or attached to the house do. The exemption is narrow and a deck has to meet every part of it to skip the permit: not more than 200 square feet, not more than 30 inches above grade at any point, not attached to the house, and not serving the required exit door. We will tell you for certain once we have measured.
How long do permits take?
It varies by city. Your timeline is written into the quote so you are not guessing.
What if my existing deck was never permitted?
It comes up at the Deck Check. We will tell you what the city is likely to want before you commit to anything.
Licensed and insured
Workmanship warranty

Book a free Deck Check.

We measure, photograph and inspect what's there. It's free, and the report is yours whether you build with us or not.

What a Deck Check covers