Serving Salt Lake City, Ogden & the Wasatch Front.  Mon–Fri 9–6 · Sat 8–4  Email: hello@homedeckingpros.com
Home Decking
Pros
Free Deck Check Or, email ushello@homedeckingpros.com
★ 10-Year Workmanship Warranty
Home  ›  FAQs

Every question
we get, answered.

62 answers, grouped by what you are actually trying to find out. Each one links to the page that goes deeper. If yours is not here, a free Deck Check is the fastest way to ask it.

Cost, quotes and financing

What a deck costs, how the number is built, and what stops it moving.

What does a deck actually cost in Utah?
Every deck is different — size, height above grade, board line and railing all move the number. What doesn't change is how we price it: itemized before anything is ordered, permit included, and locked at signature. Your Deck Check gets you a real figure for your yard.

Full detail: Cost Guide

Can you give me a ballpark over the phone?
Not an honest one. Height above grade alone can change the structure completely, and that is not something anyone can assess down a phone line.

Full detail: Cost Guide

How is the price worked out?
Itemized before anything is ordered, permit included. You see the line items, not a single mystery number, and your signature locks it.

Full detail: Custom Deck Design & Build

What stops the price changing later?
Your signature fixes it. If something is found mid-build we stop, show you, and price it before touching it.

Full detail: Cost Guide

What makes the price move before I sign?
Size, height above grade, the board line and the railing. Those four are usually the whole difference, and you can see each of them as a line.

Full detail: No-Surprises Pricing

What happens if something is found mid-build?
We stop, show you, and price it before touching it. Nothing is added to your total without your written approval.

Full detail: No-Surprises Pricing

What does a backyard transformation cost?
It depends on size, height above grade, the board line and the railing. The quote is itemized so you can see exactly which of those is moving the number.

Full detail: Backyard Transformations

Do you offer financing?
Yes — financing is available. We name the lender, the rate and the term in writing with your estimate, before you sign anything. Financing details.

Full detail: Financing

Does financing change the price?
No. The itemized quote is the same either way, and it is fixed before anything is ordered.

Full detail: Financing

When do I need to decide?
After you have the quote. There is no reason to think about payment before you know the number.

Full detail: Financing

Who provides the financing?
We name the lender in writing with your estimate. The terms and the monthly figure are shown on your quote before you commit to anything.

Full detail: Financing

The free Deck Check

The inspection that comes before any quote. It is free and there is no obligation.

Why do you offer free Deck Checks?
Because failing decks hurt people. Loose railings, rotted ledgers and hidden moisture cause most collapses, and none of them are visible from the patio. We'll inspect yours free and hand you the report whether you hire us or not. Book a Deck Check.

Full detail: The Deck Check

Is the Deck Check really free?
Yes, and there is no obligation attached to it. If your deck is sound we will tell you that.

Full detail: The Deck Check

How long does a Deck Check take?
Long enough to get under the deck and photograph the structure properly. We will give you the window when we book it.

Full detail: The Deck Check

What if the Deck Check finds my deck is fine?
Then you have a dated report saying so, with photographs, which is worth having before you sell or before a busy summer.

Full detail: The Deck Check

Permits, code and inspections

Whether you need one, who pulls it, and what the inspector checks.

Do I need a permit for my deck?
Usually, yes. The exemption in the building code Utah adopts statewide is narrow, and a deck has to meet every part of it to skip the permit: not more than 200 square feet, not more than 30 inches above grade at any point, not attached to the house, and not serving the required exit door. Miss one and it needs a permit. Most decks worth building miss at least one. We handle the drawings, the submission, the inspections and the follow-up calls — it is in the quote, not an extra. Permits & inspections, or find your own city.

Full detail: Permits & Inspections

How long does a permit take?
It genuinely varies by city, and we will not quote you an average that turns out to be someone else’s. Your timeline is written into your quote for your city, so you are not guessing. The city permit pages list each department and what it asks for.

Full detail: Permits & Inspections

What if my existing deck was never permitted?
It comes up at the Deck Check. We will tell you what the city is likely to want before you commit to anything.

Full detail: Permits & Inspections

Do I need a permit for a custom deck?
Most decks over 30 inches above grade, or attached to the house, do. We handle the drawings, the submission, the inspections and the follow-up calls — it is in the quote, not an extra.

Full detail: Custom Deck Design & Build

Does a pergola need a permit?
Often, depending on size, height and whether it attaches to the house. We draw it, file it and meet the inspector either way.

Full detail: Pergolas & Awnings

Are there rules about railing height?
Yes — height and baluster spacing are set by code and checked at inspection. We build to it and meet the inspector.

Full detail: Railing & Lighting

Composite, wood and what we build

Why we build one thing, and what the difference actually costs over ten years.

Is it true you never have to stain a composite deck?
Correct — capped composite never needs staining, sealing or sanding. The cap is what does it: a bonded outer shell that blocks moisture and UV, so the board holds its color instead of graying out. More in the decking dictionary.

Full detail: Capped Composite

Isn't composite more expensive?
On day one, yes. The comparison that matters is ten years, once staining, sealing and board replacement are counted.

Full detail: Composite vs Wood

Why won't you build pressure-treated?
Because in this climate it costs more over ten years than it saves on day one, and we would rather not build something we would have to come back and argue about.

Full detail: Capped Composite

Do you ever build in timber?
No. We build capped composite only, which is also why nobody here is trying to talk you into the cheaper board.

Full detail: Composite vs Wood

Does composite fade?
The colorways are UV-stable. The cap is there specifically to stop the graying that untreated timber does in a Utah summer.

Full detail: Capped Composite

Can I put composite on my existing frame?
Sometimes. If the substructure is sound, resurfacing costs far less than a rebuild. A free Deck Check tells you which one you have.

Full detail: Composite vs Wood

Is a capped board the same as composite?
Not quite. All capped boards are composite, but not all composite boards are capped. The cap is the part that stops the graying.

Full detail: Decking Dictionary

Color, heat and the Utah sun

Fade, surface temperature, and what changes between the six board colors.

Can I see the colors on my own house?
Yes — that is the point of the 3D design stage. You change the board and the railing and see it on your elevation before anything is ordered.

Full detail: Board Colors

Which color stays coolest?
The two palest, Rope Swing and Island Mist. Color is the main lever on how hot a deck runs in direct sun.

Full detail: Board Colors

Do all six board colors cost the same?
They are priced as their own line item in the quote, so you can see the difference rather than guess at it.

Full detail: Board Colors

Does composite fade in Utah sun?
The colorways are UV-stable. The cap exists specifically to stop the graying that untreated timber does here.

Full detail: Heat & UV in Utah

What about snow and ice?
Capped composite is slip-resistant and does not absorb the meltwater that cracks timber when it refreezes.

Full detail: Heat & UV in Utah

Living with it

What maintenance a capped composite deck actually asks of you.

Is capped composite really no maintenance at all?
Sweeping and the occasional rinse. What is gone is the annual stain, seal and sand cycle a timber deck needs.

Full detail: Low Maintenance

What about stains from food or sunscreen?
They rinse off. There is no stain coat for them to soak into, because capped composite never gets one.

Full detail: Low Maintenance

Does it need special cleaner?
No. Soap and water, and a hose.

Full detail: Low Maintenance

Railing, lighting and built-ins

The parts that get cut first and added back most expensively.

Which railing is best?
It depends what you are protecting. Cable keeps a view, aluminum disappears visually and needs nothing, composite matches the deck. We show all three on your house before you pick.

Full detail: Railing & Lighting

Is deck lighting worth it?
It is the difference between a deck you use until nine and one you stop using at dusk. Run during the build it is a line item; retrofitted it means pulling boards.

Full detail: Railing & Lighting

Is lighting included?
It is quoted as line items you can keep or cut, like everything else. Running it during the build costs a fraction of adding it later.

Full detail: Luxury Outdoor Living

Can you add railing or lighting to an existing deck?
Sometimes. It depends on the posts and the substructure, which is exactly what a free Deck Check tells you.

Full detail: Railing & Lighting

Do built-in benches replace railing?
Not by themselves — railing heights are set by code and by how far above grade the deck sits. The design shows you where both go.

Full detail: Luxury Outdoor Living

Can you build in a fire table or a kitchen run?
Yes, and the framing and clearances are designed around them from the start rather than worked around at the end.

Full detail: Luxury Outdoor Living

Can a pergola be added to my existing deck?
Sometimes — it depends on what the substructure can carry. Book a free Deck Check and we will tell you what is there before anyone quotes you.

Full detail: Pergolas & Awnings

Should a pergola be attached to the house or freestanding?
Both. Attached keeps the span clear and ties into the house; freestanding avoids touching the roofline. The 3D model shows you the difference on your own house.

Full detail: Pergolas & Awnings

Can lighting go in it?
Yes, and it is far cheaper during the build than after. We run low-voltage lines while the frame is open.

Full detail: Pergolas & Awnings

Pool decks

Heat, grip and the pool edge.

Does composite get too hot around a pool?
Every deck surface warms in direct sun. Color is the lever you actually control — the lighter colorways run coolest, and we will show you the six side by side.

Full detail: Pool Decks

Is it slippery when wet?
Capped composite is textured and slip-resistant, which is one of the main reasons we build pool decks in it rather than smooth timber.

Full detail: Pool Decks

Can you deck right up to the pool edge?
Edge and coping detail depends on your pool and your city's barrier rules. We plan the layout around both, and the permit covers it.

Full detail: Pool Decks

What about chlorine and sunscreen?
They rinse off with a hose. There is no stain or seal coat for them to strip, because capped composite never gets one.

Full detail: Pool Decks

The build itself

Who turns up, what happens to the old deck, and what your yard looks like meanwhile.

Do you take out the old deck?
Yes. Demo is a line item in the quote, and the same crew that removes the old one builds the new one.

Full detail: Backyard Transformations

Who actually turns up?
The same crew, from demo through to the final walkthrough. You are not handed between subcontractors mid-build.

Full detail: Our Process

Can you work around existing trees and grade?
That is usually the whole design problem, and it is why we measure and photograph before drawing anything.

Full detail: Backyard Transformations

Will the yard be usable during the build?
We keep access and the work area as tight as the job allows, and you see the stage and the photos from site each day.

Full detail: Backyard Transformations

Can you build on a slope or over a walkout basement?
Yes. Elevated builds 8–11 ft above grade are routine for us, and the substructure is engineered for the height and the span rather than eyeballed.

Full detail: Custom Deck Design & Build

How long does an outdoor living build take?
It depends on size, height and permit turnaround in your city. You get the timeline in the quote, before you commit.

Full detail: Luxury Outdoor Living

When do I pay?
Nothing is ordered until the itemized quote is signed. The schedule of payments is on the quote, in writing, before you commit.

Full detail: Our Process

After the build

The workmanship warranty, in writing, and what it covers.

What does the workmanship warranty cover?
How the deck was built — the fastening, flashing and framing. The boards themselves carry their own manufacturer warranty on top.

Full detail: Workmanship Warranty

What is covered after the build?
A 10-year workmanship warranty, in writing. The boards carry their own manufacturer warranty on top of that.

Full detail: Custom Deck Design & Build

Do I have to maintain the deck to keep it?
No. Capped composite needs no stain or seal, so there is no maintenance condition to fall foul of.

Full detail: Workmanship Warranty

When do I get the warranty document?
At the final walkthrough, in writing, along with the rest of the handover.

Full detail: Workmanship Warranty

Words you will see on the quote

Two terms that decide more of your price than anything else on the page.

Why does the ledger get so much attention?
Because when a deck pulls away from a house, that is almost always where it happened. It is the first thing a Deck Check looks at.

Full detail: Decking Dictionary

What is 'above grade' and why does it change the price?
It is how high the deck sits above the ground. Height changes the footings, the framing and whether you need a permit.

Full detail: Decking Dictionary