Deck permits in
Taylorsville.
Taylorsville tells you its review time up front — and warns that resubmitting starts the clock again.
Do you need a permit to build a deck in Taylorsville?
Yes for any deck of a usable size. Taylorsville enforces the state-adopted 2021 IRC, so a deck escapes a permit only under the full code exemption — free-standing, 200 sq ft or less, no more than 30″ above grade, unattached and not serving an exit door.
Source: Taylorsville City Building Department — Design Criteria. Read from the city’s own document and verified .
The numbers your drawings have to use
These come straight from the city’s published design criteria. They are what a plan reviewer checks a deck against.
| Criterion | Value |
|---|---|
| Ground snow load | 28 psf |
| Wind speed | 115 mph, Exposure B |
| Seismic design | D2 |
| Codes | 2024 IBC, 2021 IRC, 2024 IPC / IMC / IFGC / IECC, 2023 NEC |
| Plan review | At most 10 business days |
| Resubmitting plans | Resets the review time |
| Office hours | Mon–Fri 8am–5pm; inspections 9am–4pm |
Note the Exposure B. Taylorsville sits in built-up suburban terrain and uses the sheltered exposure, while West Jordan, Riverton and Herriman — a few miles south — all use the open-terrain Exposure C. Same 115 or 105 mph ballpark, different assumption about what is upwind, and it lands on anything with a roof over it.
The review clock, and how to lose it
Taylorsville publishes a plain commitment: expect at most 10 business days for plan review, and it may be faster. Very few cities put a number on it.
The sting is in the next sentence: resubmitting plans resets the review time. A submittal that comes back for corrections does not resume where it left off — it starts over. That makes getting the first submittal complete worth two weeks of calendar, which is most of a deck build.
Taylorsville publishes its people
The department lists names and direct numbers rather than a single switchboard: Steve Porten, Building Official; Kathy LeMay, Plan Reviewer; Davis Brown, Building Coordinator; Eric Thornton, Building Inspector Coordinator.
For questions about allowable size, location or height, Taylorsville directs you to Community Development, not the Building Department — that is the zoning question, and asking the wrong desk costs a day.
Who to talk to at the city
Taylorsville City Building Department, 2600 Taylorsville Blvd, Taylorsville, UT 84129. Main 801-963-5400; Building Official Steve Porten 385-379-5495 · Building Department. Open Mon–Fri 8–5, inspections 9–4.
Get the first submittal right. With a 10-day review that restarts on resubmission, a missing framing detail is not a day’s delay — it is potentially another full review cycle, and in June that is the difference between using the deck this summer and next.
We handle this part
A complete first submittal so the 10-day clock runs once, sizing to 28 psf at Exposure B, and inspections booked inside the 9–4 window — in our quote, not an extra.
