Deck permits in
South Jordan.
South Jordan derives its snow and wind from ASCE 7 rather than printing a number — and regulates when your crew can start.
Do you need a permit to build a deck in South Jordan?
Yes for any deck of a usable size. South Jordan enforces the 2021 IRC including Appendices E and Q, so a deck avoids a permit only under the full code exemption — free-standing, 200 sq ft or less, no more than 30″ above grade, unattached and not serving an exit door. Permits and inspections run through the city’s Online Portal.
Source: South Jordan City Building Codes & Design Criteria. Read from the city’s own document and verified .
The numbers your drawings have to use
These come straight from the city’s published design criteria. They are what a plan reviewer checks a deck against.
| Criterion | Value |
|---|---|
| Frost depth | 30 inches minimum, bottom of footing to finished grade |
| Snow loads | Per Chapter 7 of ASCE 7 — no city figure |
| Wind loads | Per Chapters 26–30 of ASCE 7, Exposure C |
| Seismic zone | D |
| Residential code | 2021 IRC, Appendices E and Q |
| Work before 7am or after 10pm | Noise Disturbance Permit required |
South Jordan takes the same approach as Wasatch County: it names the method rather than the answer. Snow comes from ASCE 7 Chapter 7, wind from Chapters 26–30 at Exposure C. That puts the derivation on the designer, and a drawing that just asserts a load without showing where it came from is the kind that gets a comment.
You need a permit to start early
This one is unusual and it is a scheduling issue, not a building one. If a contractor wants to work before 7am or past 10pm, South Jordan requires a Noise Disturbance Permit, approved through the Salt Lake County Health Department — and a copy of the approved permit must be given to the Building Department.
On a deck in July, starting at 6am to beat the heat is a normal instinct. In South Jordan it needs paperwork from the county first.
Frost depth is measured to finished grade
30 inches minimum from the bottom of the footing to the finished grade — the same wording Riverton uses, and the same trap. Finished grade is where the ground will be when the job is done, not where it is when you dig. On a deck with regrading or a new patio alongside, those are different levels.
Other forms that touch deck work
- Owner/Builder Certification if you act as your own contractor.
- Storm water forms — SWPPP templates and the DEQ storm water permit system.
- Engineering forms including a grading plan example and certification.
- A Water Efficient Landscaping Notice and a Trash Sanitation Notice also apply to residential work.
Who to talk to at the city
South Jordan City Building Department — permits and inspections through the city’s Online Portal · Building Department.
South Jordan publishes no snow load figure. It requires the value to be derived from ASCE 7 Chapter 7. Any site quoting you a South Jordan snow load in pounds per square foot has taken it from somewhere other than the city.
We handle this part
Loads derived from ASCE 7 and shown on the drawings, footings to 30 inches below finished grade, the Noise Disturbance Permit where the schedule needs an early start, SWPPP, and inspections — in our quote, not an extra.