The city publishes exactly what a plan reviewer checks against. Here are the numbers that decide your footings.
Do you need a permit to build a deck in Salt Lake City?
Yes, for almost any deck worth building. Salt Lake City enforces the 2021 IRC with State amendments, so a deck is exempt only if it meets every part of the IRC §105.2 exemption — free-standing, not more than 200 sq ft, floor not more than 30″ above grade at any point, not attached to the dwelling and not serving an exit door. Miss any one of those and it is permitted work.
Source: Salt Lake City Building Services Design Criteria (effective 7/1/2026). Read from the city’s own document and verified .
The numbers your drawings have to use
These come straight from the city’s published design criteria. They are what a plan reviewer checks a deck against.
| Criterion | Value |
|---|---|
| Frost depth | 30 inches |
| Ground snow load (Pg) | 28 psf minimum at or below 4,239 ft MSL |
| Allowable foundation bearing | 1,500 psf |
| Lateral bearing pressure | 100 psf per foot |
| Wind speed, residential | 115 mph, 3-second gust at 33 ft |
| Seismic design category, residential | D2 |
| Residential code | 2021 IRC, Appendices AE and AQ |
| Climate zone / weathering | 5B / Severe |
| Winter design temperature | 8°F |
Two of these decide a deck more than anything else. Frost depth of 30 inches is the minimum your footings have to reach, and 1,500 psf is what the soil is assumed to carry unless a geotechnical report says otherwise — together they set the diameter and depth of every pier. The 28 psf snow load applies at or below 4,239 ft; above that elevation the city sends you to the USU Utah Ground Snow Load map for a site value, and parts of the east bench are above that line.
When Salt Lake City makes you get a soils report
A residential project has to provide a site-specific geotechnical report if any one of these is true — and the third one catches people out on infill lots:
- The building footprint is greater than 3,000 sq ft, or gross floor area is 6,000 sq ft or more.
- The grade supporting the structure has a slope of 15 percent or more.
- The lot is one on which a previous structure once existed.
Reports must be dated no more than two years before the permit application, or come with a letter from a geotechnical engineer confirming they still hold.
Applying
- Applications go through the city’s online permitting system; the counter is at 451 South State Street, Room 215.
- Questions by email to slcpermits@slc.gov.
- Salt Lake City has been updating its building-code ordinances, so confirm the current submittal list at application rather than working from an older handout.
Who to talk to at the city
Salt Lake City Building Services — Permits, 451 South State Street, Room 215, Salt Lake City, UT 84111. Phone 801-535-7752 · slcpermits@slc.gov · Building Services.
Check the elevation before trusting the snow load. The 28 psf figure is a floor, not a blanket value — it applies at or below 4,239 ft MSL. Above that the city requires a site value from the USU map, and a good part of the east bench sits higher. A deck designed to 28 psf above that line is under-designed, and it is the kind of thing that surfaces at inspection rather than at plan review.
We handle this part
Footing depth and diameter from the real frost depth and bearing pressure, the snow load for your actual elevation, drawings, submission and inspections — in our quote, not an extra.