Deck permits in
Provo.
Provo publishes its structural design criteria in full. These are the numbers your footings and framing have to answer to.
Do you need a permit to build a deck in Provo?
Yes for any deck of a usable size. Provo enforces the 2021 code with State amendments, so a deck escapes a permit only if it satisfies the whole IRC §105.2 exemption at once — free-standing, 200 sq ft or less, floor no more than 30″ above grade, not attached to the house and not serving an exit door. Anything attached to the dwelling is permitted work regardless of size.
Source: Provo City Design Criteria, Building Division. Read from the city’s own document and verified .
The numbers your drawings have to use
These come straight from the city’s published design criteria. They are what a plan reviewer checks a deck against.
| Criterion | Value |
|---|---|
| Ground snow load | 31 psf |
| Frost line depth | 30 inches |
| Wind speed | 115 mph |
| Topographic effects | Yes |
| Special wind region | Yes |
| Seismic design category | D-2 |
| Weathering | Severe |
| Ice barrier underlayment required | Yes |
| Air freezing index | 834 |
| Elevation | 4,491 ft |
Two of these are worth pausing on. Provo’s 31 psf ground snow load is higher than Salt Lake City’s 28 psf minimum, so a detail copied from a valley job can be under-designed here. And Provo is flagged as a special wind region with topographic effects — which matters for anything roofed: a pergola or a covered deck catches wind in a way an open deck does not, and the bench and canyon-mouth lots are exactly where it bites.
What decides your footings here
A 30-inch frost line is the minimum depth for any footing carrying the deck. Provo also lists weathering as Severe, which governs the concrete and the hardware that go in the ground.
Provo publishes the criteria as coming from the 2021 International Building Code, with ground snow load taken from the Utah Ground Snow Load Map. For a deck the residential provisions apply, but the site values are the same.
Applying
- Permits are applied for through Provo’s Self Service Portal, with building inspections scheduled through the same system.
- Provo’s Building Division publishes answers to “When is a Building Permit required?” and “Are there any areas of Provo that have specific concerns for builders?” — worth reading, because the second one is about geology, not paperwork.
- City Hall is at 445 W Center St, Suite 500.
Who to talk to at the city
Provo City Development Services, Building Division, 445 W Center Street, Suite 500, Provo, UT 84601. Customer service 801-852-6000 · design criteria.
Do not carry a Salt Lake detail into Provo unchanged. The frost depth matches at 30 inches, but the snow load does not — 31 psf here against a 28 psf minimum there — and Provo is a special wind region while Salt Lake City is not. Those two differences land on beam sizing and on anything with a roof over it.
We handle this part
Sizing to Provo’s actual snow and wind numbers, footings to the 30-inch frost line, drawings, the Self Service Portal submission and inspections — in our quote, not an extra.
