Deck permits in
Herriman.
Herriman states its frost depth two ways, and the difference decides how deep you actually dig.
Do you need a permit to build a deck in Herriman?
Yes for any deck of a usable size. Herriman enforces the 2021 IRC including Appendices AE and AQ, so a deck is exempt only if it meets the entire IRC §105.2 exemption — free-standing, 200 sq ft or less, floor no more than 30″ above grade, unattached to the dwelling and not serving an exit door.
Source: Herriman City Building Codes and Design Criteria. Read from the city’s own document and verified .
The numbers your drawings have to use
These come straight from the city’s published design criteria. They are what a plan reviewer checks a deck against.
| Criterion | Value |
|---|---|
| Frost depth | 30 in. minimum, bottom of footing to finished grade |
| Frost depth, measured the other way | 36 in., bottom of footing to top of slab or foundation wall |
| Ground snow load | No fixed figure — USU snow load map, per site |
| Wind load | 115 mph, Exposure C |
| Seismic zone | D |
| Residential code | 2021 IRC, Appendices AE and AQ |
That double frost-depth statement is not pedantry. 30 inches to finished grade and 36 inches to the top of a slab or foundation wall are different holes, and which one applies depends on what your footing sits next to. On a deck tight against the house, the second measurement is usually the governing one — and it is six inches deeper than the number most people quote.
There is no Herriman snow load number
Herriman does not publish a single ground snow load. Its criteria point at the USU Utah Ground Snow Load map and require the value for the site. Herriman runs from roughly the valley floor up into the foothills, so a figure taken from one end of the city is not safe at the other.
Wind is given as 115 mph at Exposure C — open terrain. That is the exposure category most of Herriman genuinely sits in, and it is less sheltered than a built-up valley neighbourhood, which shows up on anything roofed.
Applying
- Building Division hours are 7:30 a.m. to 5:30 p.m., Monday to Friday.
- Inspection requests must be called before 4:00 p.m. — miss it and you lose the next day, which is the kind of thing that quietly adds a week to a build.
- Building Official is Cathryn Nelson, with two assistant building officials on the same line.
Who to talk to at the city
Herriman City Building Division. Phone 801-446-5327 · building@herriman.gov · codes and design criteria.
Confirm which frost-depth measurement applies before anyone digs. Getting it wrong by six inches is a failed footing inspection and a hole dug twice, and it is the single most common correction on deck footings in cities that state it both ways.
We handle this part
Pulling the snow load for your address rather than guessing a city-wide number, footings dug to whichever frost measurement governs, drawings, submission and inspections — in our quote, not an extra.
