Deck permits in
Draper.
Draper publishes a deck-specific checklist with four thresholds your drawings have to declare — and it rejects locked PDFs on sight.
Do you need a permit to build a deck in Draper?
Yes, and Draper has its own deck checklist. Applications go through the Building Services Online Portal, with a $100 application fee invoiced 24–48 hours after submission and the permit fee invoiced separately at issuance. Drawings must be a single unlocked PDF with consecutively numbered pages.
Source: Draper City Deck Permit Submission Requirements (rev. 24 June 2024). Read from the city’s own document and verified .
The numbers your drawings have to use
These come straight from the city’s published design criteria. They are what a plan reviewer checks a deck against.
| Criterion | Value |
|---|---|
| Application fee | $100, invoiced 24–48 hours after submittal |
| Permit fee | Invoiced separately, paid at issuance |
| Drawing format | One unlocked PDF, consecutive pages, drawn to scale |
| Locked PDFs | Returned immediately without review |
| Must be noted — snow | Roof snow load exceeding 70 psf |
| Must be noted — area | Deck area exceeding 120 ft² |
| Must be noted — height | Deck floor more than 8 ft above grade |
| Must be noted — projection | Deck projecting more than 8 ft from the house wall |
| Wood | No. 2 grade or better, preservative-treated per R317 or naturally durable |
Those four thresholds are not permit triggers — they are declarations Draper requires on the construction drawings. Cross any one of them and the reviewer needs it stated explicitly, because each takes the deck outside the prescriptive tables in the IRC and into designed territory. A drawing that quietly exceeds 120 ft² without saying so is an incomplete submittal.
Draper’s geotechnical rule is unlike anywhere else on our list
Draper states that the Building Department will not accept plans or applications for homes, townhouses, apartments, twin homes or commercial buildings unless a geotechnical engineering report for that parcel has already been reviewed, approved and accepted by Draper City.
Draper also charges a deposit for geologic peer review and publishes its own Geotechnical Engineering Standards. This is the Wasatch fault and the Traverse Mountain bench in administrative form. The rule as written names buildings rather than decks, so for a deck on an existing lot it usually will not bite — but on new or recently developed parcels, ask before you design.
Draper quotes the wood rule and the penalty
The checklist reproduces 2021 IRC R507.2.1: structural wood must be No. 2 grade or better, preservative-treated per R317 or naturally durable, and termite-protected where required. Where the deck is designed rather than prescriptive, members use the wet service factor from the AWC NDS.
Then it states the consequence plainly: use of the wrong wood materials will require replacement with compliant materials. Not a correction on paper — taking it out and doing it again.
What the framing plan must show
- Floor joist size, spacing, lumber type and grade.
- Beam size, type and locations.
- Post size, locations, and connections to beams and to footings or foundations.
- Footing size, depth, reinforcement and locations.
- Deck connection to the house and the flashing requirement.
- Stair, landing, handrail and guardrail connection details.
- Site plan with existing buildings, fences, retaining walls, easements, proposed utilities, and dimensioned distances to property lines and adjacent structures.
Who to talk to at the city
Draper City Building Division, 1020 E. Pioneer Rd., Draper, UT 84020. Building Office 801-576-6399, Monday to Friday 8:00am–5:00pm · building permits and checklists.
Unlock the PDF before you upload it. Draper states that digital files must be unlocked to allow commenting by plans examiners, and that locked files are returned immediately without being reviewed. That is a week lost to a file setting.
We handle this part
The deck checklist, the four threshold declarations, unlocked single-file PDFs that are not bounced, correct grade and treatment of every structural member, and inspections — in our quote, not an extra.
